El Dorado Springs Solar Farm
A 2.5 MW solar power plant in Cedar, Missouri, owned by Missouri Jnt Muni.Pwr Elec. Ut. Comm., commissioned in 2018.
Facility nameplate · EIA Plant ID 61566Solar
Nameplate capacity
2.5 MW
Primary fuel
Solar
Commissioned
2018
Location
Cedar, Missouri
Coordinates
Generation (2024)
4.2 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Location
Cedar, Missouri · 37.8587, -94.0026
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2018 | 2.9 | |
| 2019 | 3.7 | |
| 2020 | 4.4 | |
| 2021 | 4.5 | |
| 2022 | 4.6 | |
| 2023 | 4.4 | |
| 2024 | 4.2 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Stockton Hydro | Hydroelectric | 52 MW | ~27 km |
| Nevada | Oil | 21.6 MW | ~30 km |
| Butler Municipal Power Plant | Oil | 10.9 MW | ~54 km |
| Butler Solar Power Project | Solar | 2.8 MW | ~55 km |
| Oak Grove Power Producers | Waste | 3.6 MW | ~61 km |
| Kings Point Wind Energy Center | Wind | 149.4 MW | ~66 km |