Campo Verde Solar
A 147.4 MW solar power plant in Imperial, California, owned by Southern Power Co, commissioned in 2013.
Facility nameplate · EIA Plant ID 58467Solar
Nameplate capacity
147.4 MW
Primary fuel
Solar
Commissioned
2013
Time in queue (2010→2013)
3.7 yrs
Owner
Southern Power Co
Location
Imperial, California
Coordinates
Generation (2024)
294.7 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2010, commercial operation 2013 — 3.7 years in the queue. See the CAISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 368.9 | |
| 2016 | 362.3 | |
| 2017 | 351.5 | |
| 2018 | 326.5 | |
| 2019 | 335.8 | |
| 2020 | 335.3 | |
| 2021 | 345.6 | |
| 2022 | 349.2 | |
| 2023 | 328.6 | |
| 2024 | 294.7 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| CED West Side Canal Battery Storage | Storage | 131 MW | ~3 km |
| Imperial Solar Energy Center West | Solar | 148.7 MW | ~5 km |
| SEPV Imperial Dixieland East | Solar | 2 MW | ~6 km |
| SEPV Imperial Dixieland West | Solar | 3 MW | ~7 km |
| Drew Solar LLC | Solar | 100 MW | ~9 km |
| Centinela State Prison | Solar | 6 MW | ~10 km |
See all solar plants in California or browse all plants in California.