Drew Solar LLC
A 100 MW solar power plant in Imperial, California, owned by Drew Solar LLC, commissioned in 2022.
Facility nameplate · EIA Plant ID 63127Solar
Nameplate capacity
100 MW
Primary fuel
Solar
Commissioned
2022
Time in queue (2011→2022)
11.6 yrs
Owner
Drew Solar LLC
Location
Imperial, California
Coordinates
Generation (2024)
310.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2011, commercial operation 2022 — 11.6 years in the queue. See the CAISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2022 | 40 | |
| 2023 | 294 | |
| 2024 | 310.5 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| LeConte Energy Storage | Storage | 125 MW | ~1 km |
| Centinela Solar Energy | Solar | 174.8 MW | ~2 km |
| Imperial Solar Energy Center South | Solar | 128.9 MW | ~3 km |
| Mount Signal Solar Farm II | Solar | 153.5 MW | ~4 km |
| Wistaria Ranch Solar | Solar | 106.7 MW | ~5 km |
| CED West Side Canal Battery Storage | Storage | 131 MW | ~7 km |