Chamberlain Wind Project

A 2.6 MW wind power plant in Brule, South Dakota, owned by Basin Electric Power Coop, commissioned in 2001, retired in 2023.

Facility nameplate · EIA Plant ID 7974Retired 2023Wind
Nameplate capacity
2.6 MW
Primary fuel
Wind
Commissioned
2001
Owner
Basin Electric Power Coop
Location
Generation (2023)
0 GWh
Status
Retired
Retired
2023
Technology
Onshore Wind Turbine
Units
2

Reported annual generation

YearGWh
20152.9
20165.2
20173.3
20181.2
20191.6
20200.9
20210.6
20220.1
20230

Nearby power plants

PlantFuelCapacityDistance
Big Bend DamHydroelectric538.3 MW~26 km
Brule County WindWind20 MW~30 km
Prairie Winds SD1Wind162 MW~37 km
Aurora County WindWind20 MW~41 km
Wessington SpringsWind51 MW~55 km
North Bend Wind Project, LLCWind200 MW~67 km