Hecate Energy Cherrydale LLC

A 20 MW solar power plant in Northampton, Virginia, owned by Dominion Renewable Energy, commissioned in 2017.

Facility nameplate · EIA Plant ID 61375Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2017
Time in queue (2013→2017)
3.7 yrs
Location
Northampton, Virginia
Coordinates
Generation (2024)
28.8 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2013, commercial operation 2017 — 3.7 years in the queue. See the PJM queue or typical durations.

Location

Map of the United States showing the location of Hecate Energy Cherrydale LLC

Northampton, Virginia · 37.37, -75.9172

Reported annual generation

YearGWh
20175.9
201831.6
201936.9
202036
202138
202232.3
202330.6
202428.8

Nearby power plants

PlantFuelCapacityDistance
BayviewOil12 MW~12 km
Belle Haven Diesel Generation FacilityOil4 MW~23 km
TasleyOil27 MW~42 km
Onancock Diesel Generation FacilityOil4 MW~45 km
Perdue Diesel Generation FacilityOil4 MW~47 km
Gloucester SolarSolar19.9 MW~48 km

See all solar plants in Virginia or browse all plants in Virginia.