Hecate Energy Clarke County LLC

A 10 MW solar power plant in Clarke, Virginia, owned by Dominion Renewable Energy, commissioned in 2017.

Facility nameplate · EIA Plant ID 61374Solar
Nameplate capacity
10 MW
Primary fuel
Solar
Commissioned
2017
Time in queue (2014→2017)
3.4 yrs
Location
Clarke, Virginia
Generation (2024)
15.2 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2014, commercial operation 2017 — 3.4 years in the queue. See the PJM queue or typical durations.

Location

Map of the United States showing the location of Hecate Energy Clarke County LLC

Clarke, Virginia · 39.0648, -78.1382

Reported annual generation

YearGWh
20179.3
201816.3
201917.8
202017.4
202117
20223.2
202311.9
202415.2

Nearby power plants

PlantFuelCapacityDistance
HP Hood CTNatural Gas15 MW~9 km
Frederick County LFGTE FacilityWaste2 MW~9 km
Bartonsville Energy Facility, LLCSolar130 MW~9 km
Warren CountyNatural Gas1.47 GW~11 km
Foxglove SolarSolar75 MW~12 km
DG AMP Solar Front RoyalSolar2.5 MW~15 km