A 80 MW solar power plant in Macon, Georgia, owned by CPV Stagecoach Solar, LLC, commissioned in 2024.

Facility nameplate · EIA Plant ID 67021Solar
Nameplate capacity
80 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2020→2024)
3.8 yrs
Owner
CPV Stagecoach Solar, LLC
Location
Macon, Georgia
Generation (2024)
117.7 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2020, commercial operation 2024 — 3.8 years in the queue. See the Southeast queue or typical durations.

Location

Map of the United States showing the location of CPV Stagecoach Solar

Macon, Georgia · 32.1978, -84.0693

Nearby power plants

PlantFuelCapacityDistance
Flint River OperationsBiomass77 MW~6 km
Freeman AvenueSolar1.4 MW~8 km
Brady Solar LLCSolar1.8 MW~20 km
SR DeSoto I, LLCSolar165 MW~35 km
SR PerrySolar68 MW~36 km
SR DeSoto IISolar65 MW~36 km

See all solar plants in Georgia or browse all plants in Georgia.