Wistaria Ranch Solar
A 106.7 MW solar power plant in Imperial, California, owned by Consolidated Edison Development Inc., commissioned in 2018.
Facility nameplate · EIA Plant ID 61750Solar
Nameplate capacity
106.7 MW
Primary fuel
Solar
Commissioned
2018
Time in queue (2008→2018)
10.4 yrs
Owner
Consolidated Edison Development Inc.
Location
Imperial, California
Coordinates
Generation (2024)
291.9 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2008, commercial operation 2018 — 10.4 years in the queue. See the CAISO queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2018 | 15.4 | |
| 2019 | 292.6 | |
| 2020 | 269.8 | |
| 2021 | 258.8 | |
| 2022 | 252.8 | |
| 2023 | 273.1 | |
| 2024 | 291.9 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Mount Signal Solar Farm II | Solar | 153.5 MW | ~1 km |
| Centinela Solar Energy | Solar | 174.8 MW | ~3 km |
| Imperial Valley Solar, LLC | Solar | 199.9 MW | ~3 km |
| Imperial Solar Energy Center South | Solar | 128.9 MW | ~4 km |
| Drew Solar LLC | Solar | 100 MW | ~5 km |
| LeConte Energy Storage | Storage | 125 MW | ~5 km |
See all solar plants in California or browse all plants in California.