Dry Lake Solar Energy Center
A 250 MW solar power plant in Clark, Nevada, owned by Nevada Power Co, commissioned in 2024.
Facility nameplate · EIA Plant ID 63933Solar
Nameplate capacity
250 MW
Primary fuel
Solar
Commissioned
2024
Owner
Nevada Power Co
Location
Clark, Nevada
Coordinates
Generation (2024)
260.5 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Harry Allen | Natural Gas | 745 MW | ~1 km |
| Playa Solar 2 | Solar | 100 MW | ~3 km |
| Playa Solar 1, LLC | Solar | 79 MW | ~3 km |
| Harry Allen Solar Energy LLC | Solar | 100 MW | ~5 km |
| Arrow Canyon Solar Hybrid | Solar | 275 MW | ~5 km |
| Chuck Lenzie Generating Station | Natural Gas | 1.47 GW | ~6 km |
See all solar plants in Nevada or browse all plants in Nevada.