East Blackland Solar Project 1
A 144 MW solar power plant in Travis, Texas, owned by Duke Energy Renewables Services, commissioned in 2021.
Facility nameplate · EIA Plant ID 57659Solar
Nameplate capacity
144 MW
Primary fuel
Solar
Commissioned
2021
Time in queue (2015→2021)
6.3 yrs
Owner
Duke Energy Renewables Services
Location
Travis, Texas
Coordinates
Generation (2024)
271.9 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a ERCOT interconnection request (LBNL Queued Up): queued 2015, commercial operation 2021 — 6.3 years in the queue. See the ERCOT queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2021 | 147.8 | |
| 2022 | 320.1 | |
| 2023 | 303.6 | |
| 2024 | 271.9 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| TX19 River Valley Storage 1 | Storage | 50 MW | ~10 km |
| TX21 River Valley Storage 2 | Storage | 50 MW | ~10 km |
| TX12 Silicon Hill Storage | Storage | 100 MW | ~11 km |
| WAL5479 | Natural Gas | 1.2 MW | ~14 km |
| Austin Gas Recovery | Waste | 4.8 MW | ~18 km |
| WAL5480 | Natural Gas | 1.2 MW | ~19 km |
See all solar plants in Texas or browse all plants in Texas.