Everglades Solar Energy Center
A 74.5 MW solar power plant in Miami Dade, Florida, owned by Florida Power & Light Co, commissioned in 2023.
Facility nameplate · EIA Plant ID 65423Solar
Nameplate capacity
74.5 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2017→2023)
5.6 yrs
Owner
Florida Power & Light Co
Location
Miami Dade, Florida
Coordinates
Generation (2024)
142.9 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2017, commercial operation 2023 — 5.6 years in the queue. See the Southeast queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 133.4 | |
| 2024 | 142.9 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| G W Ivey | Natural Gas | 35.7 MW | ~11 km |
| Miami Dade Solar Energy Center | Solar | 74.5 MW | ~13 km |
| South District Wastewater Treatment Plt | Natural Gas | 8 MW | ~22 km |
| Turkey Point | Nuclear | 2.86 GW | ~25 km |
| FIU Solar | Solar | 1.2 MW | ~31 km |
| IKEA Miami 327 | Solar | 1 MW | ~32 km |
See all solar plants in Florida or browse all plants in Florida.