Fox Squirrel Solar
A 577 MW solar power plant in Madison, Ohio, owned by EDF Renewable Asset Holdings, Inc., commissioned in 2023.
Facility nameplate · EIA Plant ID 67239Solar
Nameplate capacity
577 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2019→2024)
5.7 yrs
Owner
EDF Renewable Asset Holdings, Inc.
Location
Madison, Ohio
Coordinates
Generation (2024)
623.1 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2019, commercial operation 2024 — 5.7 years in the queue. See the PJM queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 8 | |
| 2024 | 623.1 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Big Plain Solar, LLC | Solar | 196 MW | ~9 km |
| Darby Power, LLC | Natural Gas | 564 MW | ~18 km |
| IGS CMH4, LLC | Solar | 4.2 MW | ~19 km |
| PS ST-8 Engine No 1 | Oil | 2 MW | ~34 km |
| Renick Run Pumping Station 03-04 | Oil | 2.8 MW | ~35 km |
| 3100 Valleyview Drive | Solar | 1 MW | ~35 km |