FPL Cypress Pond Solar
A 74.5 MW solar power plant in Washington, Florida, owned by Florida Power & Light Co, commissioned in 2023.
Facility nameplate · EIA Plant ID 65593Solar
Nameplate capacity
74.5 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2020→2023)
3.2 yrs
Owner
Florida Power & Light Co
Location
Washington, Florida
Coordinates
Generation (2024)
164 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2020, commercial operation 2023 — 3.2 years in the queue. See the Southeast queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 102.6 | |
| 2024 | 164 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| FPL Saw Palmetto Solar Energy Center | Solar | 74.5 MW | ~0 km |
| FPL Shirer Branch Solar Energy Center | Solar | 74.5 MW | ~16 km |
| Fourmile Creek | Solar | 74.5 MW | ~16 km |
| FPL Chipola River Solar Energy Center | Solar | 74.5 MW | ~16 km |
| Bay Ranch Solar Power Plant | Solar | 74.9 MW | ~29 km |
| Lansing Smith | Natural Gas | 661.5 MW | ~30 km |
See all solar plants in Florida or browse all plants in Florida.