Kennett Solar

A 4.9 MW solar power plant under construction in Dunklin, Missouri, owned by Evergy Kansas Central, Inc, expected online 2025.

Facility nameplate · EIA Plant ID 68286Under constructionSolar
Nameplate capacity
4.9 MW
Primary fuel
Solar
Commissioned
Location
Dunklin, Missouri
Status
Under construction
Expected online
2025
Technology
Solar Photovoltaic
Units
1

Location

Map of the United States showing the location of Kennett Solar

Dunklin, Missouri · 36.2079, -90.0572

Nearby power plants

PlantFuelCapacityDistance
KennettOil31.4 MW~3 km
Municipal LightOil7.2 MW~23 km
Dell Power StationNatural Gas679.1 MW~39 km
MaldenOil15.9 MW~39 km
Crooked Lake Solar, LLCSolar175 MW~41 km
St Francis Energy FacilityNatural Gas506.6 MW~43 km