Mesquite Solar 2, LLC

A 100 MW solar power plant in Maricopa, Arizona, owned by Consolidated Edison Development Inc., commissioned in 2016.

Facility nameplate · EIA Plant ID 60307Solar
Nameplate capacity
100 MW
Primary fuel
Solar
Commissioned
2016
Time in queue (2013→2017)
4.5 yrs
Location
Maricopa, Arizona
Generation (2024)
276.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2013, commercial operation 2017 — 4.5 years in the queue. See the CAISO queue or typical durations.

Location

Map of the United States showing the location of Mesquite Solar 2, LLC

Maricopa, Arizona · 33.3328, -112.9114

Reported annual generation

YearGWh
201613.3
2017290.9
2018285
2019256
2020263.7
2021256.2
2022253.9
2023274.4
2024276.6

Nearby power plants

PlantFuelCapacityDistance
Mesquite Solar 4, LLCSolar62.5 MW~1 km
Mesquite Solar 5, LLCSolar120 MW~1 km
Mesquite Solar 1Solar170 MW~1 km
Arlington Valley Energy FacilityNatural Gas713 MW~2 km
Mesquite Solar 3, LLCSolar150 MW~3 km
Mesquite Generating Station Block 1Natural Gas691.6 MW~5 km

See all solar plants in Arizona or browse all plants in Arizona.