Mesquite Solar 3, LLC

A 150 MW solar power plant in Maricopa, Arizona, owned by Consolidated Edison Development Inc., commissioned in 2016.

Facility nameplate · EIA Plant ID 60308Solar
Nameplate capacity
150 MW
Primary fuel
Solar
Commissioned
2016
Location
Maricopa, Arizona
Generation (2024)
456.3 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Location

Map of the United States showing the location of Mesquite Solar 3, LLC

Maricopa, Arizona · 33.3476, -112.9368

Reported annual generation

YearGWh
201621.1
2017440.6
2018445.8
2019445.6
2020453.2
2021433.1
2022457.7
2023461.6
2024456.3

Nearby power plants

PlantFuelCapacityDistance
Mesquite Solar 4, LLCSolar62.5 MW~3 km
Mesquite Solar 2, LLCSolar100 MW~3 km
Mesquite Solar 5, LLCSolar120 MW~3 km
Mesquite Solar 1Solar170 MW~3 km
Arlington Valley Energy FacilityNatural Gas713 MW~4 km
Mesquite Generating Station Block 1Natural Gas691.6 MW~7 km

See all solar plants in Arizona or browse all plants in Arizona.