Paulding Wind Farm II
A 99 MW wind power plant in Paulding, Ohio, owned by Paulding Wind Farm II LLC, commissioned in 2011.
Facility nameplate · EIA Plant ID 57620Wind
Nameplate capacity
99 MW
Primary fuel
Wind
Commissioned
2011
Time in queue (2006→2011)
4.6 yrs
Owner
Paulding Wind Farm II LLC
Location
Paulding, Ohio
Coordinates
Generation (2024)
302 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1
This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2006, commercial operation 2011 — 4.6 years in the queue. See the PJM queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 336.9 | |
| 2016 | 331.6 | |
| 2017 | 344.9 | |
| 2018 | 311.7 | |
| 2019 | 322.8 | |
| 2020 | 314 | |
| 2021 | 301.9 | |
| 2022 | 334.8 | |
| 2023 | 300.2 | |
| 2024 | 302 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Timber Road Solar Park | Solar | 49.9 MW | ~9 km |
| Timber Road IV | Wind | 125.1 MW | ~11 km |
| Paulding Wind Farm III | Wind | 100.8 MW | ~11 km |
| Robert P Mone Plant | Natural Gas | 596.7 MW | ~11 km |
| Northwest Ohio Wind | Wind | 109.8 MW | ~16 km |
| Haviland Plastic Products | Wind | 4.5 MW | ~16 km |