PPL Frey Farm Landfill Wind
A 3.2 MW wind power plant in Lancaster, Pennsylvania, owned by NextEra Renewable Fuels, LLC, commissioned in 2011.
Facility nameplate · EIA Plant ID 57182Wind
Nameplate capacity
3.2 MW
Primary fuel
Wind
Commissioned
2011
Time in queue (2009→2011)
1.3 yrs
Owner
NextEra Renewable Fuels, LLC
Location
Lancaster, Pennsylvania
Coordinates
Generation (2024)
3.4 GWh
Status
Operating
Technology
Onshore Wind Turbine
Units
1
This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2009, commercial operation 2011 — 1.3 years in the queue. See the PJM queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2015 | 6.1 | |
| 2016 | 6.7 | |
| 2017 | 6.2 | |
| 2018 | 6.2 | |
| 2019 | 6 | |
| 2020 | 6.4 | |
| 2021 | 5.7 | |
| 2022 | 5.9 | |
| 2023 | 5.6 | |
| 2024 | 3.4 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Frey Farm Landfill | Waste | 3.2 MW | ~1 km |
| Safe Harbor | Hydroelectric | 417.5 MW | ~7 km |
| Mount Joy Wire | Natural Gas | 1.1 MW | ~17 km |
| Holtwood | Hydroelectric | 247.3 MW | ~18 km |
| Lancaster County Resource Recovery | Waste | 35.7 MW | ~20 km |
| Muddy Run | Hydroelectric | 1.07 GW | ~21 km |
See all wind plants in Pennsylvania or browse all plants in Pennsylvania.