A 5.6 MW solar power plant in Prince Georges, Maryland, owned by Spectrum Solar LLC, commissioned in 2023.
Facility nameplate · EIA Plant ID 67490Solar
Nameplate capacity
5.6 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2018→2024)
5.9 yrs
Owner
Spectrum Solar LLC
Location
Prince Georges, Maryland
Coordinates
Generation (2024)
10.7 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
2
This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2018, commercial operation 2024 — 5.9 years in the queue. See the PJM queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 0 | |
| 2024 | 10.7 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| IGS CC, LLC | Solar | 1.5 MW | ~2 km |
| UMCP CHP Plant | Natural Gas | 27.4 MW | ~4 km |
| WMATA - Cheverly Metro (CSG) | Solar | 1.9 MW | ~5 km |
| CUA West Campus - North (CSG) | Solar | 3 MW | ~5 km |
| CUA West Campus - South (CSG) | Solar | 2.8 MW | ~5 km |
| NCS Paradise LLC | Solar | 1.3 MW | ~5 km |