Taylor Creek Solar
A 74.5 MW solar power plant in Orange, Florida, owned by Taylor Creek Solar LLC, commissioned in 2020.
Facility nameplate · EIA Plant ID 63583Solar
Nameplate capacity
74.5 MW
Primary fuel
Solar
Commissioned
2020
Time in queue (2017→2020)
2.6 yrs
Owner
Taylor Creek Solar LLC
Location
Orange, Florida
Coordinates
Generation (2024)
165.2 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2017, commercial operation 2020 — 2.6 years in the queue. See the Southeast queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2020 | 92.1 | |
| 2021 | 183.9 | |
| 2022 | 180.9 | |
| 2023 | 176 | |
| 2024 | 165.2 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Curtis H Stanton Energy Center | Natural Gas | 688.3 MW | ~12 km |
| Stanton Energy Center | Coal | 1.26 GW | ~12 km |
| ACE-Stanton A PV | Solar | 4.1 MW | ~12 km |
| RP-Orlando, LLC | Solar | 5.1 MW | ~13 km |
| ACE-Stanton PV | Solar | 4.8 MW | ~13 km |
| Lockheed Martin Solar | Oil | 3.9 MW | ~17 km |
See all solar plants in Florida or browse all plants in Florida.