Watlington Solar

A 20 MW solar power plant in Halifax, Virginia, owned by Consolidated Edison Development Inc., commissioned in 2023.

Facility nameplate · EIA Plant ID 65221Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2019→2023)
3.6 yrs
Location
Halifax, Virginia
Coordinates
Generation (2024)
39.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2019, commercial operation 2023 — 3.6 years in the queue. See the PJM queue or typical durations.

Location

Map of the United States showing the location of Watlington Solar

Halifax, Virginia · 36.6815, -78.886

Reported annual generation

YearGWh
202334.6
202439.6

Nearby power plants

PlantFuelCapacityDistance
Halifax County BiomassBiomass49.9 MW~2 km
Halifax CSG LLCSolar3.1 MW~5 km
Halifax (VA)Hydroelectric1.6 MW~12 km
Sunnybrook Solar Project - HybridSolar51 MW~14 km
MayoCoal763.2 MW~17 km
Alton Post Office SolarSolar75 MW~18 km

See all solar plants in Virginia or browse all plants in Virginia.