Watlington Solar

A 20 MW solar power plant in Halifax, Virginia, owned by Consolidated Edison Development Inc., commissioned in 2023.

Facility nameplate · EIA Plant ID 65221Solar
Nameplate capacity
20 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (20192023)
3.6 yrs
Location
Halifax, Virginia
Coordinates
Generation (2024)
39.6 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2019, commercial operation 2023 3.6 years in the queue. See the PJM queue or typical durations.

Location

Map of the United States showing the location of Watlington Solar

Halifax, Virginia · 36.6815, -78.886

Reported annual generation

YearGWh
202334.6
202439.6

Nearby power plants

PlantFuelCapacityDistance
Halifax County BiomassBiomass49.9 MW~2 km
Halifax CSG LLCSolar3.1 MW~5 km
Halifax (VA)Hydroelectric1.6 MW~12 km
Sunnybrook Solar Project - HybridSolar51 MW~14 km
MayoCoal763.2 MW~17 km
Alton Post Office SolarSolar75 MW~18 km

See all solar plants in Virginia or browse all plants in Virginia.