White River Solar 2

A 19.8 MW solar power plant in Tulare, California, owned by Consolidated Edison Development Inc., commissioned in 2014.

Facility nameplate · EIA Plant ID 58973Solar
Nameplate capacity
19.8 MW
Primary fuel
Solar
Commissioned
2014
Time in queue (2010→2014)
4.7 yrs
Location
Tulare, California
Generation (2024)
48.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2010, commercial operation 2014 — 4.7 years in the queue. See the CAISO queue or typical durations.

Location

Map of the United States showing the location of White River Solar 2

Tulare, California · 35.8747, -119.0461

Reported annual generation

YearGWh
201553.1
201652.9
201751.2
201849.7
201949.9
202049.3
202150
202252.2
202349.3
202448.4

Nearby power plants

PlantFuelCapacityDistance
CED Ducor 1Solar20 MW~3 km
CED Ducor 4Solar20 MW~3 km
CED Ducor 3Solar15 MW~3 km
CED Ducor 2Solar20 MW~4 km
Nicolis Solar PV PlantSolar20 MW~4 km
Tropico Solar PV PlantSolar14 MW~5 km