White River Solar 2

A 19.8 MW solar power plant in Tulare, California, owned by Consolidated Edison Development Inc., commissioned in 2014.

Facility nameplate · EIA Plant ID 58973Solar
Nameplate capacity
19.8 MW
Primary fuel
Solar
Commissioned
2014
Time in queue (20102014)
4.7 yrs
Owner
Consolidated Edison Development Inc.
Location
Tulare, California
Generation (2024)
48.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2010, commercial operation 2014 4.7 years in the queue. See the CAISO queue or typical durations.

Reported annual generation

YearGWh
201553.1
201652.9
201751.2
201849.7
201949.9
202049.3
202150
202252.2
202349.3
202448.4

Nearby power plants

PlantFuelCapacityDistance
CED Ducor 1Solar20 MW~3 km
CED Ducor 4Solar20 MW~3 km
CED Ducor 3Solar15 MW~3 km
CED Ducor 2Solar20 MW~4 km
Nicolis Solar PV PlantSolar20 MW~4 km
Tropico Solar PV PlantSolar14 MW~5 km

See all solar plants in California or browse all plants in California.