State queue · Texas
Texas interconnection queue
2,090 proposed generation and storage projects — 1,900 active and 190 suspended — are in Texas's interconnection queue, primarily in the ERCOT, totaling 476.54 GW of requested capacity. Battery leads with 137.87 GW.
2,090
Proposed projects
476.54 GW
Requested capacity
Battery
Largest resource type
2027
Median planned online year
Requested capacity by resource type
Battery 28.9%Solar + Battery 24.5%Solar 22.3%Wind 12.7%Gas 11.0%Other 0.6%Hydro 0.1%
Proposed projects by resource type
Battery projects739 · 137.87 GWSolar + Battery projects544 · 116.83 GWSolar projects461 · 106.05 GWWind projects208 · 60.34 GWGas projects115 · 52.23 GW
Also in the queue (too few for a dedicated page): Other (21), Hydro (2).
All proposed projects in Texas
| Type | ||||
|---|---|---|---|---|
| Prairie Ridge (Gas - CC) 30INR0071 | Gas | 1.66 GW | 2025 | 2032 |
| Hecate Energy Orem Wind 27INR0061 | Wind | 1.54 GW | 2023 | 2030 |
| Aegle Power 27INR0084 | Gas | 1.54 GW | 2024 | 2027 |
| Big Canyon Wind 30INR0018 | Wind | 1.50 GW | 2025 | 2031 |
| Caldwell County Energy Center 30INR0031 | Gas | 1.50 GW | 2025 | 2030 |
| Mule Deer Run Gas 32INR0003 | Gas | 1.38 GW | 2025 | 2032 |
| Queue GEN-2024-377 GEN-2024-377 | Gas | 1.35 GW | 2025 | 2031 |
| BasRanch (TEF - Due Diligence) 25INR0008 | Gas | 1.35 GW | 2020 | 2028 |
| Sandow Lakes Energy Station 27INR0071 | Gas | 1.29 GW | 2024 | 2028 |
| Jewett Energy Center 1 Gas 29INR0150 | Gas | 1.27 GW | 2025 | 2029 |
| Tolar Energy Center 29INR0180 | Gas | 1.25 GW | 2025 | 2029 |
| Limitless Energy Hub I 27INR0581 | Gas | 1.24 GW | 2025 | 2028 |
| Limitless Energy Hub II 27INR0582 | Gas | 1.24 GW | 2025 | 2028 |
| Southeast Oklahoma Pumped Storage 30INR0002 | Other | 1.23 GW | 2022 | 2030 |
| Wolf Bone North Energy Center 29INR0162 | Gas | 1.20 GW | 2025 | 2029 |
| Corvette Windsusp. 28INR0033 | Wind | 1.20 GW | 2024 | — |
| Spectra Solar 28INR0486 | Solar | 1.20 GW | 2025 | 2028 |
| Eagle Pines Gas 18INR0009 | Gas | 1.17 GW | 2015 | 2028 |
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 R1003 | Gas | 1.17 GW | 2020 | 2026 |
| Aurelius Solar 29INR0003 | Solar | 1.12 GW | 2023 | 2028 |
| Bastrop Peaking Generators (TEF-Due Diligence) 26INR0261 | Gas | 1.10 GW | 2024 | 2027 |
| Zeus Armstrong BESS 25INR0587 | Solar + Battery | 1.04 GW | 2024 | 2028 |
| Zeus Scurry BESS 27INR0535 | Solar + Battery | 1.04 GW | 2025 | 2028 |
| Zeus Mitchell BESS 25INR0589 | Solar + Battery | 1.04 GW | 2024 | 2029 |
| Zeus Mitchell BESS II 26INR0686 | Solar + Battery | 1.04 GW | 2025 | 2027 |
| EmberGreen 28INR0090 | Gas | 1.04 GW | 2024 | 2028 |
| Hecate Energy Arkansas Wind 30INR0004 | Wind | 1.03 GW | 2023 | 2030 |
| Hecate Energy Jamaica Wind 30INR0003 | Wind | 1.03 GW | 2023 | 2030 |
| Kickstart Energy Storage VI 29INR0218 | Battery | 1.03 GW | 2025 | 2029 |
| Ross Solar 26INR0155 | Solar + Battery | 1.03 GW | 2023 | 2027 |
| Pumpville Ranch 1susp. 25INR0398 | Solar | 1.00 GW | — | — |
| Kickstart Energy Storage V 29INR0217 | Battery | 999 MW | 2025 | 2029 |
| Black Mountain Hale Gas 29INR0175 | Gas | 990.6 MW | 2025 | 2029 |
| Zeus Spade Wind 26INR0386 | Wind | 987.3 MW | 2024 | 2027 |
| Complex Serenity Wind 28INR0215 | Wind | 971 MW | 2025 | 2029 |
| Kilby1 Part 4 Large Block Simple Cycle 28INR0459 | Gas | 950 MW | 2025 | 2028 |
| Riviera Gas 29INR0206 | Gas | 941.8 MW | 2025 | 2030 |
| Queue GEN-2023-204 GEN-2023-204 | Gas | 914.6 MW | 2023 | 2028 |
| EmberYork 28INR0089 | Gas | 900 MW | 2024 | 2028 |
| Fierce River Solar 27INR0221 | Solar + Battery | 895.7 MW | 2024 | 2029 |
| West Royal Natural Gas (TEF-Due Diligence) 28INR0086 | Gas | 888 MW | 2024 | 2030 |
| Lost Pines Power Park 30INR0052 | Gas | 880 MW | 2025 | 2030 |
| SCHNEIDER COMBINED CYCLE 30INR0054 | Gas | 880 MW | 2025 | 2030 |
| Sim Gideon Combined Cycle 30INR0051 | Gas | 880 MW | 2025 | 2030 |
| MilamStation Power Secured Gas Generation 29INR0120 | Gas | 846 MW | 2025 | 2029 |
| Entergy Texas, Inc. project E0030 | Gas | 820 MW | 2025 | 2027 |
| Shadow Ranch Solar 25INR0207 | Solar | 807.6 MW | 2022 | 2026 |
| Zeus Mitchell Solar 25INR0588 | Solar + Battery | 804.7 MW | 2024 | 2029 |
| Indigo Solar 3 28INR0067 | Solar | 800 MW | 2024 | 2028 |
| Blue Bird Solar 24INR0075 | Solar | 773 MW | 2021 | 2028 |
| Axis Ridge Wind 28INR0113 | Wind | 750 MW | 2024 | 2029 |
| Central Power Station 26INR0370 | Gas | 750 MW | 2024 | 2027 |
| Nabla Energy Storage I 27INR0571 | Battery | 750 MW | 2025 | 2028 |
| Nabla Energy Storage II 28INR0466 | Battery | 750 MW | 2025 | 2028 |
| FGE Texas 2 Gassusp. 17INR0010 | Gas | 742.9 MW | 2014 | 2028 |
| Buffalo Jump Wind 27INR0334 | Wind | 740 MW | 2025 | 2029 |
| Meitner 2 Wind 29INR0103 | Wind | 709.1 MW | 2025 | 2028 |
| Meitner Wind 26INR0113 | Wind | 709 MW | 2023 | 2027 |
| Meitner Solar 25INR0080 | Solar | 702.6 MW | 2022 | 2027 |
| Cedar Bayou 5 (TEF - Due Diligence) 23INR0029 | Gas | 697 MW | 2020 | 2027 |
| TEXPO 22INR0497 | Gas | 680 MW | 2021 | 2027 |
| Dovetail Solar 1 24INR0094 | Solar + Battery | 666.1 MW | 2021 | 2027 |
| Dovetail Solar 2 24INR0095 | Solar + Battery | 666.1 MW | 2021 | 2029 |
| Dovetail Solar 3 24INR0097 | Solar + Battery | 666.1 MW | 2021 | 2029 |
| Jack County III – 345 kV 26INR0351 | Gas | 660 MW | 2023 | 2027 |
| Coleto Creek - Fuel Change Only 26INR0664 | Gas | 655 MW | 2025 | 2026 |
| Pinnington Solar 24INR0010 | Solar + Battery | 653.7 MW | 2020 | 2026 |
| Commodus 2 Wind 29INR0033 | Wind | 641.5 MW | 2025 | 2029 |
| Commodus Wind 29INR0031 | Wind | 641.4 MW | 2024 | 2029 |
| Cavell Wind 29INR0035 | Wind | 641.2 MW | 2024 | 2029 |
| Short Creek Solar 24INR0201 | Solar + Battery | 628.3 MW | 2022 | 2027 |
| Aurelius 3 Wind 29INR0012 | Wind | 623 MW | 2023 | 2029 |
| Aurelius 2 Wind 29INR0010 | Wind | 621.6 MW | 2023 | 2028 |
| Aurelius Wind 29INR0004 | Wind | 621.6 MW | 2023 | 2028 |
| Howard Road BESS 29INR0173 | Battery | 617.6 MW | 2025 | 2028 |
| Comanche BESS 27INR0365 | Battery | 614.4 MW | 2024 | 2028 |
| Tumbleweed Solar 27INR0086 | Solar + Battery | 613.9 MW | 2023 | 2027 |
| Symphony BESS 26INR0466 | Battery | 612 MW | 2025 | 2028 |
| Skylab Solar 22INR0337 | Solar | 609.7 MW | 2020 | 2025 |
| White Oak King Wind 24INR0508 | Wind | 606.5 MW | 2023 | 2027 |
| Kingsmill Wind SLF 27INR0140 | Wind | 606.3 MW | 2024 | 2029 |
| Lavita BESS 26INR0465 | Battery | 606 MW | 2024 | 2028 |
| Hiru Solar 23INR0228 | Solar + Battery | 603.7 MW | 2021 | 2029 |
| Moccasin Solar 26INR0269 | Solar + Battery | 603.6 MW | 2023 | 2027 |
| Operation Sunshine 26INR0255 | Solar + Battery | 603.2 MW | 2023 | 2028 |
| Moccasin Storage 27INR0452 | Solar + Battery | 603.1 MW | 2025 | 2028 |
| Danish Fields Solar 20INR0069 | Solar | 602.8 MW | 2018 | 2026 |
| Hobby BESS I 26INR0546 | Battery | 602.6 MW | 2024 | 2027 |
| Rocking X Solar 23INR0368 | Solar | 602.2 MW | 2023 | 2027 |
| Cachena Solar SLF 23INR0027 | Solar + Battery | 601.3 MW | 2020 | 2027 |
| Reunion Solar 28INR0332 | Solar + Battery | 600.9 MW | 2025 | 2028 |
| Capoterra BESSsusp. 25INR0088 | Battery | 600 MW | 2022 | — |
| Longleaf Power Station 26INR0294 | Gas | 600 MW | 2023 | 2028 |
| Proteus London-Leigh Solar SLF 25INR0608 | Solar + Battery | 600 MW | 2024 | 2028 |
| Scorpius Solar 26INR0609 | Solar | 600 MW | 2024 | 2029 |
| Sitges Wind 28INR0017 | Wind | 600 MW | 2024 | 2029 |
| Tehuacana Windsusp. 19INR0101 | Wind | 600 MW | 2017 | — |
| Tempesta BESSsusp. 25INR0090 | Battery | 600 MW | 2022 | — |
| Capoterrasusp. 25INR0087 | Solar | 598 MW | 2022 | — |
| Brittlebush BESSsusp. 25INR0095 | Battery | 597.1 MW | 2022 | — |
Showing the 100 largest of 2,090 projects by requested capacity.
See 908 operating plants in Texas · Regions: ERCOT, SPP, MISO, Non-ISO West.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).