Arkansas · Battery
Proposed battery projects in Arkansas
There are 8 proposed battery projects in Arkansas's interconnection queue, totaling 1.54 GW of requested capacity. The largest is Queue J4082 at 500 MW, and the median planned online year is 2028.
8
Proposed projects
1.54 GW
Requested capacity
192.8 MW
Average project size
2028
Median planned online year
All proposed battery projects in Arkansas
| Type | ||||
|---|---|---|---|---|
| Queue J4082 J4082 | Battery | 500 MW | 2025 | 2030 |
| Queue GEN-2022-130 GEN-2022-130 | Battery | 200 MW | 2023 | 2030 |
| Surplus; J1434 S1101 | Battery | 200 MW | 2025 | 2027 |
| Surplus; J1562 S1100 | Battery | 200 MW | 2025 | 2027 |
| Surplus; J1007 S1094 | Battery | 180 MW | 2025 | 2026 |
| Queue J4174 J4174 | Battery | 140 MW | 2025 | 2030 |
| Queue GEN-2024-SR2 GEN-2024-SR2 | Battery | 72.5 MW | 2024 | 2027 |
| Queue GEN-2023-206 GEN-2023-206 | Battery | 50 MW | 2023 | 2029 |
Browse Arkansas's full interconnection queue. Compare with operating capacity: 4 operating storage plants in Arkansas. Nationwide: Storage plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition). Data: LBNL backbone through December 31, 2025; ISO-region statuses refreshed monthly (last: July 2026); non-ISO West and Southeast as of the LBNL edition.