Indiana · Gas
Proposed gas projects in Indiana
There are 20 proposed gas projects in Indiana's interconnection queue, totaling 14.25 GW of requested capacity. The largest is Schahfer CCGTs at 2.74 GW, and the median planned online year is 2028.
20
Proposed projects
14.25 GW
Requested capacity
712.7 MW
Average project size
2028
Median planned online year
All proposed gas projects in Indiana
| Type | ||||
|---|---|---|---|---|
| Schahfer CCGTs E0042 | Gas | 2.74 GW | 2025 | 2028 |
| Queue J3999 J3999 | Gas | 1.54 GW | 2025 | 2030 |
| Malden CCGT E0035 | Gas | 1.09 GW | 2025 | 2028 |
| Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 R1044 | Gas | 1.04 GW | 2024 | 2028 |
| Replacing 722 MW Coal with 285 MW of Battery and 437MW of Gas; Schahfer R5062 | Gas | 732.7 MW | 2024 | 2027 |
| Queue J351 J351 | Gas | 715 MW | 2014 | 2020 |
| Bluegrass Power LLC project AG2-072 | Gas | 700 MW | 2025 | 2026 |
| Queue J3604 J3604 | Gas | 650 MW | 2024 | 2027 |
| Queue J3084 J3084 | Gas | 641.8 MW | 2025 | 2026 |
| Sullivan Generating Station 1 AB1-087 | Gas | 575 MW | 2015 | 2027 |
| Sullivan Generating Station 2 AB1-088 | Gas | 575 MW | 2015 | 2027 |
| Merom Station E0054 | Gas | 530 MW | 2025 | 2028 |
| Queue J3232 J3232 | Gas | 500 MW | 2024 | 2028 |
| Queue J4005 J4005 | Gas | 500 MW | 2025 | 2028 |
| Queue J3331 J3331 | Gas | 470 MW | 2024 | 2028 |
| Queue J4021 J4021 | Gas | 470 MW | 2025 | 2028 |
| Queue J3666 J3666 | Gas | 378.8 MW | 2024 | 2028 |
| Madison County Combustion Turbine E0046 | Gas | 267.8 MW | 2025 | 2028 |
| Queue J3870 J3870 | Gas | 87 MW | 2024 | 2002 |
| St. Joseph Energy Center, LLC project AG2-562 | Gas | 52 MW | 2025 | 2022 |
Browse Indiana's full interconnection queue. Compare with operating capacity: 45 operating natural gas plants in Indiana. Nationwide: Natural Gas plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).