14 proposed generation and storage projects — 14 active and 0 suspended — are in Maine's interconnection queue, primarily in the ISO New England, totaling 824.7 MW of requested capacity. Solar leads with 646.4 MW.
14
Proposed projects
824.7 MW
Requested capacity
Solar
Largest resource type
2027
Median planned online year
Requested capacity by resource type
Solar 78.4%Solar + Battery 19.4%Wind 2.2%
Proposed projects by resource type
Also in the queue (too few for a dedicated page): Solar + Battery (1), Wind (1).
All proposed projects in Maine
| Type | ||||
|---|---|---|---|---|
| Solar 1427 | Solar | 180 MW | 2023 | 2029 |
| Battery Storage Addition (to QP1086) 1261 | Solar + Battery | 160 MW | 2022 | 2028 |
| Solar 1100 | Solar | 140 MW | 2021 | 2029 |
| Three Rivers Solar 833 | Solar | 100 MW | 2019 | 2026 |
| Warren Meadow Solar 1086 | Solar | 74.5 MW | 2020 | 2028 |
| Solar Knox 1190 | Solar | 33.5 MW | 2021 | 2027 |
| BD Solar Church Hill 953 | Solar | 20 MW | 2020 | 2028 |
| GDC Saco Solar 929 | Solar | 20 MW | 2019 | 2027 |
| Turner Meadow Solar 1139 | Solar | 19.8 MW | 2021 | 2027 |
| Twin Energy Wind 1171 | Wind | 18.3 MW | 2021 | 2026 |
| SolarFairfield 1087 | Solar | 18.1 MW | 2020 | 2027 |
| West Baldwin Solar 935 | Solar | 17.1 MW | 2019 | 2029 |
| Emery Meadow Solar 1021 | Solar | 16.4 MW | 2020 | 2027 |
| Solar 903 | Solar | 7 MW | 2019 | 2022 |
See 237 operating plants in Maine · Region: ISO New England.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition). Data: LBNL backbone through December 31, 2025; ISO-region statuses refreshed monthly (last: July 2026); non-ISO West and Southeast as of the LBNL edition.