State queue · Massachusetts
Massachusetts interconnection queue
35 proposed generation and storage projects — 35 active and 0 suspended — are in Massachusetts's interconnection queue, primarily in the ISO New England, totaling 11.21 GW of requested capacity. Battery leads with 5.87 GW.
35
Proposed projects
11.21 GW
Requested capacity
Battery
Largest resource type
2028
Median planned online year
Requested capacity by resource type
Battery 52.3%Offshore Wind 47.5%Solar 0.1%Hydro 0.1%Wind 0.0%Gas 0.0%
Proposed projects by resource type
Also in the queue (too few for a dedicated page): Solar (1), Hydro (1), Wind (1), Gas (1).
All proposed projects in Massachusetts
| Type | ||||
|---|---|---|---|---|
| Bay State Wind 4 Offshore Wind 944 | Offshore Wind | 1.20 GW | 2019 | 2033 |
| SouthCoast Wind 1 1116 | Offshore Wind | 1.20 GW | 2021 | 2031 |
| Offshore Wind 806 | Offshore Wind | 827 MW | 2018 | 2032 |
| Vineyard Offshore Wind 624 | Offshore Wind | 800 MW | 2016 | 2026 |
| Park City Offshore Wind 700 | Offshore Wind | 791 MW | 2017 | 2029 |
| Battery Storage 1143 | Battery | 508.2 MW | 2021 | 2028 |
| Battery Storage 1543 | Battery | 500 MW | 2024 | 2028 |
| Battery Storage 1567 | Battery | 500 MW | 2024 | 2028 |
| Offshore Wind Inc. (Q806) 1109 | Offshore Wind | 487 MW | 2021 | 2032 |
| Battery Storage 1460 | Battery | 350 MW | 2023 | 2027 |
| Lite Brite Battery Storage 1148 | Battery | 305.6 MW | 2021 | 2028 |
| Battery Storage 1238 | Battery | 300 MW | 2022 | 2028 |
| Battery Storage 1513 | Battery | 300 MW | 2024 | 2028 |
| Battery Storage 1515 | Battery | 290 MW | 2024 | 2028 |
| Battery Storage 1365 | Battery | 250 MW | 2023 | 2029 |
| Hecate Energy Eastern Ave Energy Center 1115 | Battery | 250 MW | 2021 | 2026 |
| Medway Grid Battery Storage 844 | Battery | 250 MW | 2019 | 2025 |
| Battery Storage 1557 | Battery | 225 MW | 2024 | 2028 |
| Norman Street Battery Storage 1110 | Battery | 204 MW | 2021 | 2028 |
| Battery Storage 1320 | Battery | 203.9 MW | 2022 | 2027 |
| Battery Storage 1555 | Battery | 200 MW | 2024 | 2028 |
| Battery Storage 1551 | Battery | 180 MW | 2024 | 2028 |
| Battery Storage 1542 | Battery | 170 MW | 2024 | 2029 |
| Battery Storage 1546 | Battery | 170 MW | 2024 | 2029 |
| Energy Storage 877 | Battery | 170 MW | 2019 | 2027 |
| Battery Storage 1412 | Battery | 168 MW | 2023 | 2027 |
| Battery Storage 1518 | Battery | 136 MW | 2024 | 2028 |
| Battery Storage 1553 | Battery | 125 MW | 2024 | 2028 |
| Bear Swamp Unit 1 and 2 Upgrade 592 | Battery | 66 MW | 2016 | 2023 |
| West Springfield 45 MW BESS 1272 | Battery | 45 MW | 2022 | 2029 |
| Offshore wind Inc (QP700) 1154 | Offshore Wind | 18 MW | 2021 | 2026 |
| Solar 703 | Solar | 6.8 MW | 2018 | 2019 |
| Battery addition 1149 | Hydro | 6.7 MW | 2021 | 2027 |
| Berkshire Wind Increase 396 | Wind | 4.6 MW | 2012 | 2019 |
| NEA Bell. Uprate (Northeast Energy Associates, LP) 546 | Gas | 1.4 MW | 2015 | 2018 |
See 658 operating plants in Massachusetts · Region: ISO New England.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition) (data as of December 31, 2025).