Ohio · Battery
Proposed battery projects in Ohio
There are 13 proposed battery projects in Ohio's interconnection queue, totaling 1.14 GW of requested capacity. The largest is Wombat Solar LLC project at 200 MW, and the median planned online year is 2025.
13
Proposed projects
1.14 GW
Requested capacity
87.6 MW
Average project size
2025
Median planned online year
All proposed battery projects in Ohio
| Type | ||||
|---|---|---|---|---|
| Wombat Solar LLC project AG2-329 | Battery | 200 MW | 2025 | 2024 |
| Flint Grid AF1-062 | Battery | 200 MW | 2019 | 2027 |
| Clermont County Solar Projectsusp. AF1-045 | Battery | 152.2 MW | 2019 | 2025 |
| Butterfly Meadows AG1-411 | Battery | 100 MW | 2020 | 2024 |
| Prairie Flyer Energy Storage AG1-207 | Battery | 85 MW | 2020 | 2028 |
| Chinchilla Solar LLC project AG2-289 | Battery | 66.6 MW | 2025 | 2024 |
| Hardin Energy Center – Storage IIsusp. AE2-216 | Battery | 55 MW | 2019 | 2026 |
| Cadence Energy Storagesusp. AD2-096 | Battery | 50 MW | 2018 | 2026 |
| Hardin Energy Center – Storage Isusp. AD2-091 | Battery | 50 MW | 2018 | 2025 |
| Paulding Storage II AF2-376 | Battery | 50 MW | 2020 | 2023 |
| Timber Road Storage III AF2-377 | Battery | 50 MW | 2020 | 2029 |
| Vinton Energy Storagesusp. AE1-093 | Battery | 42 MW | 2018 | 2026 |
| Chinchilla Solar LLC project AG2-290 | Battery | 38.4 MW | 2025 | 2024 |
Browse Ohio's full interconnection queue. Compare with operating capacity: 5 operating storage plants in Ohio. Nationwide: Storage plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition). Data: LBNL backbone through December 31, 2025; ISO-region statuses refreshed monthly (last: July 2026); non-ISO West and Southeast as of the LBNL edition.