Ohio · Gas
Proposed gas projects in Ohio
There are 12 proposed gas projects in Ohio's interconnection queue, totaling 2.85 GW of requested capacity. The largest is Chestnut Run Energy LLC project at 1.30 GW, and the median planned online year is 2028.
12
Proposed projects
2.85 GW
Requested capacity
237.6 MW
Average project size
2028
Median planned online year
All proposed gas projects in Ohio
| Type | ||||
|---|---|---|---|---|
| Chestnut Run Energy LLC project AH1-680 | Gas | 1.30 GW | 2025 | — |
| West Lorain Power Plant 345 kV AG1-500 | Gas | 784.6 MW | 2020 | 2031 |
| Troy Energy, LLC project AH1-711 | Gas | 408.2 MW | 2025 | — |
| Queue H037 H037 | Gas | 135 MW | 2008 | 2010 |
| South Field Energy LLC project AH1-699 | Gas | 69 MW | 2025 | — |
| West Lorain Power Plant 345 kV AF2-004 | Gas | 33 MW | 2019 | 2031 |
| Clean Energy Future - Lordstown, LLC project AH1-706 | Gas | 30.5 MW | 2025 | — |
| Hanging Rock Power Company LLC project AH1-686 | Gas | 24 MW | 2025 | — |
| Long Ridge Energy Generation LLC project AH1-704 | Gas | 24 MW | 2025 | — |
| Washington Power Generation LLC project AH1-719 | Gas | 24 MW | 2025 | — |
| West Lorain 138 kV Power Plant AG1-501 | Gas | 11.3 MW | 2020 | 2028 |
| West Lorain 138 kV Power Plant AF2-005 | Gas | 8 MW | 2019 | 2028 |
Browse Ohio's full interconnection queue. Compare with operating capacity: 49 operating natural gas plants in Ohio. Nationwide: Natural Gas plants nationwide.
Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition). Data: LBNL backbone through December 31, 2025; ISO-region statuses refreshed monthly (last: July 2026); non-ISO West and Southeast as of the LBNL edition.