Texas · Gas

Proposed gas projects in Texas

There are 144 proposed gas projects in Texas's interconnection queue, totaling 79.23 GW of requested capacity. The largest is BM Great Rock Energy Center at 1.98 GW, and the median planned online year is 2028.

144
Proposed projects
79.23 GW
Requested capacity
550.2 MW
Average project size
2028
Median planned online year

All proposed gas projects in Texas

TypeRegionIA Status
BM Great Rock Energy Center
30INR0091
GasERCOTLeon1.98 GW20262029
Prairie Ridge (Gas - CC)
30INR0071
GasERCOTFranklinFacility Study1.66 GW20252032
Aegle Power
27INR0084
GasERCOTCameronFacility Study1.54 GW20242027
Caldwell County Energy Center
30INR0031
GasERCOTCaldwellFacility Study1.50 GW20252030
Bullock Gas
33INR0005
GasERCOTHill1.40 GW20262033
Liberty Thermal Energy Center
33INR0006
GasERCOTHill1.40 GW20262033
Mule Deer Run Gas III
31INR0022
GasERCOTAnderson1.38 GW20262031
Queue GEN-2024-377
GEN-2024-377
GasSPPHarrisonSystem Impact Study1.35 GW20252031
BasRanch (TEF - Due Diligence)
25INR0008
GasERCOTWardIA Executed1.35 GW20202028
Moon Hammer
30INR0077
GasERCOTWheeler1.30 GW20262030
Mule Deer Run Gas II
31INR0021
GasERCOTAnderson1.30 GW20262031
The Giant Arc I
30INR0113
GasERCOTPecos1.30 GW20262030
The Giant Arc-II
30INR0105
GasERCOTPecos1.30 GW20262030
Sandow Lakes Energy Station
27INR0071
GasERCOTMilamFacility Study1.29 GW20242028
Aurelius 3 Natural Gas
29INR0361
GasERCOTDeaf Smith1.27 GW20262029
Jewett Energy Center 1 Gas
29INR0150
GasERCOTFreestoneFacility Study1.27 GW20252029
Cerulean Phase 2 – CCGT
29INR0248
GasERCOTVictoria1.26 GW20262031
Mule Deer Run Gas
32INR0003
GasERCOTAndersonFacility Study1.26 GW20252031
NRG Prairie Energy Center
29INR0158
GasERCOTHill1.25 GW20262030
Tolar Energy Center
29INR0180
GasERCOTHoodFacility Study1.25 GW20252029
Gravitas I Natural Gas
30INR0084
GasERCOTPecos1.25 GW20262030
Permian I Natural Gas
31INR0019
GasERCOTPecos1.25 GW20262030
Limitless Energy Hub I
27INR0581
GasERCOTWilbargerFacility Study1.24 GW20252028
Limitless Energy Hub II
27INR0582
GasERCOTWilbargerFacility Study1.24 GW20252028
Anawa La Gas
28INR0524
GasERCOTHidalgo1.22 GW20262028
Wolf Bone North Energy Center
29INR0162
GasERCOTReevesFacility Study1.20 GW20252029
Eagle Pines Gas
18INR0009
GasERCOTCherokeeFacility Study1.17 GW20152028
Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1
R1003
GasMISOOrange1.17 GW20202026
Bastrop Peaking Generators (TEF-Due Diligence)
26INR0261
GasERCOTBastropIA Executed1.10 GW20242027
Kilby1 Part 6 Large Block Combined Cycle
29INR0199
GasERCOTReeves1.06 GW20262029
EmberGreen
28INR0090
GasERCOTWhartonFacility Study1.04 GW20242028
Trailblazer Natural Gas Generation Plant
27INR0575
GasERCOTNolan1.03 GW20262027
BM Freestone Energy Center
29INR0298
GasERCOTFreestone990.6 MW20262029
Black Mountain Fannin Gas
29INR0191
GasERCOTFannin990.6 MW20262029
Black Mountain Hale Gas
29INR0175
GasERCOTHaleFacility Study990.6 MW20252030
Kilby1 Part 4 Large Block Simple Cycle
28INR0459
GasERCOTReevesFacility Study950 MW20252028
Queue GEN-2023-204
GEN-2023-204
GasSPPMorrisFacility Study914.6 MW20232028
EmberYork
28INR0089
GasERCOTAustinIA Executed900 MW20242028
West Royal Natural Gas (TEF-Due Diligence)
28INR0086
GasERCOTUptonFacility Study888 MW20242030
Lost Pines Power Park
30INR0052
GasERCOTBastropFacility Study880 MW20252030
SCHNEIDER COMBINED CYCLE
30INR0054
GasERCOTCaldwellFacility Study880 MW20252030
Sim Gideon Combined Cycle
30INR0051
GasERCOTBastropFacility Study880 MW20252030
MilamStation Power Secured Gas Generation
29INR0120
GasERCOTMilamFacility Study846 MW20252029
Entergy Texas, Inc. project
E0030
GasMISOJeffersonIn Progress (unknown study)820 MW20252027
Central Power Station
26INR0370
GasERCOTGrimesFacility Study750 MW20242027
FGE Texas 2 Gassusp.
17INR0010
GasERCOTMitchellIA Pending742.9 MW20142028
Cedar Bayou 5 (TEF - Due Diligence)
23INR0029
GasERCOTChambersIA Executed697 MW20202027
TEXPO
22INR0497
GasERCOTWilbargerFacility Study680 MW20212027
Jack County III – 345 kV
26INR0351
GasERCOTJackFacility Study660 MW20232027
Coleto Creek - Fuel Change Only
26INR0664
GasERCOTGoliadFacility Study655 MW20252026
Riviera Gas
29INR0206
GasERCOTBellFacility Study636.9 MW20252030
Longleaf II Power Station
30INR0114
GasERCOTAngelina600 MW20262030
Longleaf Power Station
26INR0294
GasERCOTAngelinaFacility Study600 MW20232029
Tyler Rose Power Plant 1
29INR0333
GasERCOTGrimes597.4 MW20262029
RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)
28INR0108
GasERCOTGraysonFacility Study570 MW20252028
Rock House Draw Gas
27INR0653
GasERCOTPecos523 MW20262027
Elmax Power Station
23INR0345
GasERCOTHarrisIA Executed518.8 MW20212028
Queue GEN-2022-GR1
GEN-2022-GR1
GasSPPHarrisonIA Executed513 MW20222027
Fort Worth Power Core Bastrop Gas Plant
26INR0560
GasERCOTBastropFacility Study506.4 MW20252029
Black Mountain Somervell Gas Combined
27INR0497
GasERCOTSomervellFacility Study495.3 MW20252029
Halyard Whartonsusp.
16INR0044
GasERCOTWhartonIA Pending484 MW20142021
North Royal Thermal (TEF- Due Diligence)
28INR0087
GasERCOTLamarFacility Study479 MW20242030
Entergy Texas, Inc. project
E0032
GasMISOSan JacintoIn Progress (unknown study)478 MW20252027
Gregory Power Development SLF
29INR0068
GasERCOTSan PatricioFacility Study469.9 MW20242028
NRG THW GT 345 (TEF)
24INR0482
GasERCOTHarrisIA Executed456 MW20222026
TRIFECTA Gas
26INR0183
GasERCOTMidlandFacility Study453 MW20232030
Bobcat Generating Station
29INR0340
GasERCOTCaldwell450 MW20262029
Calpine Guadalupe Peakers
24INR0145
GasERCOTGuadalupeFacility Study450 MW20212030
Big Watt Mustang Power
27INR0606
GasERCOTWilliamson449 MW20262027
Big Watt Power Austin-1
29INR0167
GasERCOTCaldwellFacility Study449 MW20252028
NRG Greens Bayou 6 (TEF-Due Diligence)
24INR0410
GasERCOTHarrisIA Executed445 MW20222028
Vast Sands Power I (TEF -Due Diligence)
28INR0105
GasERCOTWardIA Executed440 MW20242028
Vast Sands Power II (TEF-Due Diligence)
28INR0109
GasERCOTWardIA Executed440 MW20242028
Wilson Gas Plant
28INR0494
GasERCOTWilson402.9 MW20262028
Boling Generation (TEF-Due Diligience)
24INR0576
GasERCOTWhartonFacility Study400 MW20232028
Exergy Energy West Texas Natural Gas Reciprocating Power I
26INR0685
GasERCOTReevesFacility Study400 MW20252027
Tyler Rose Power Plant 2
29INR0336
GasERCOTGrimes398.2 MW20262029
Kilby1 Part 1 Small Block Simple Cycle
27INR0572
GasERCOTReevesFacility Study371 MW20252027
Blue Kite
28INR0496
GasERCOTSan Patricio370.1 MW20262028
Indigo Quill Gas
30INR0080
GasERCOTGlasscock370.1 MW20262028
Cielo Vista Power Gas Plant
28INR0325
GasERCOTDuvalFacility Study343.8 MW20252028
River Boat Power Gas Plant
28INR0351
GasERCOTMitchellFacility Study334.4 MW20252028
Sky Global West Houston
26INR0519
GasERCOTAustinIA Executed324.6 MW20242027
Bulldog Power (TEF - Due Diligence)
27INR0095
GasERCOTBrazoriaFacility Study311 MW20232027
Bulldog Power II
30INR0073
GasERCOTBrazoriaFacility Study311 MW20252030
Wolf Hollow III
24INR0567
GasERCOTHoodFacility Study306.3 MW20232027
Homestead Power (TEF-Due Diligence)
29INR0041
GasERCOTAustinFacility Study260.3 MW20242029
Cowboy Power Gas Plant
28INR0353
GasERCOTSan PatricioFacility Study251.5 MW20252028
Pampa Natural Gas
29INR0341
GasERCOTRoberts250.7 MW20262030
Queue GEN-2024-343
GEN-2024-343
GasSPPHarrisonSystem Impact Study235 MW20252030
Queue ERAS-2025-016
ERAS-2025-016
GasSPPLambIn Progress (unknown study)232.5 MW20252029
Pin Peaking Energy Center 1 (TEF- Due Diligence)
26INR0049
GasERCOTFreestoneIA Executed228 MW20232026
Pin Peaking Energy Center 2 (TEF- Due Diligence)
26INR0109
GasERCOTFreestoneIA Executed228 MW20232026
SIM GIDEON GAS RICE
31INR0011
GasERCOTBastropFacility Study226 MW20252031
Tolivar Power Plant (TEF- Due Diligence)
27INR0297
GasERCOTReevesIA Executed224.5 MW20242027
Tolivar Power Plant Phase 2
28INR0413
GasERCOTReevesFacility Study224.5 MW20252027
Queue ERAS-2025-002
ERAS-2025-002
GasSPPHaleIn Progress (unknown study)217 MW20252027
Elk Unit 4
27INR0181
GasERCOTHaleFacility Study210 MW20242027
Liatris Flexible Gas
26INR0408
GasERCOTBrazoriaIA Executed204.7 MW20242029
Queue GEN-2022-147
GEN-2022-147
GasSPPHaleFacility Study203 MW20232026

Showing the 100 largest of 144 projects by requested capacity.

Browse Texas's full interconnection queue. Compare with operating capacity: 304 operating natural gas plants in Texas. Nationwide: Natural Gas plants nationwide.

Source: "Queued Up" (Rand et al., Lawrence Berkeley National Laboratory, 2026 edition). Data: LBNL backbone through December 31, 2025; ISO-region statuses refreshed monthly (last: July 2026); non-ISO West and Southeast as of the LBNL edition.