Bay Trail Solar Power Plant

A 74.9 MW solar power plant in Citrus, Florida, owned by Duke Energy Florida, LLC, commissioned in 2022.

Facility nameplate · EIA Plant ID 64145Solar
Nameplate capacity
74.9 MW
Primary fuel
Solar
Commissioned
2022
Time in queue (20172022)
5 yrs
Location
Citrus, Florida
Coordinates
Generation (2024)
145 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2017, commercial operation 2022 5 years in the queue. See the Southeast queue or typical durations.

Reported annual generation

YearGWh
202218.8
2023135.8
2024145

Nearby power plants

PlantFuelCapacityDistance
Crystal RiverNatural Gas3.45 GW~5 km
HernandoWaste1.6 MW~41 km
Hardeetown Solar Power PlantSolar74.9 MW~56 km
G2 Energy Marion LLCWaste2.4 MW~61 km
Micanopy Energy Storage FacilityStorage8.3 MW~69 km
Gilchrist County SolarSolar74.5 MW~69 km

See all solar plants in Florida or browse all plants in Florida.