Hardeetown Solar Power Plant
A 74.9 MW solar power plant in Levy, Florida, owned by Duke Energy Florida, LLC, commissioned in 2023.
Facility nameplate · EIA Plant ID 65173Solar
Nameplate capacity
74.9 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2018→2023)
4.5 yrs
Owner
Duke Energy Florida, LLC
Location
Levy, Florida
Coordinates
Generation (2024)
147.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2018, commercial operation 2023 — 4.5 years in the queue. See the Southeast queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 123.5 | |
| 2024 | 147.5 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Trenton | Storage | 11 MW | ~15 km |
| Trenton Solar Power Plant | Solar | 74.9 MW | ~17 km |
| Gilchrist County Solar | Solar | 74.5 MW | ~22 km |
| Bell Ridge Solar | Solar | 74.5 MW | ~29 km |
| County Line Renewable Energy Center | Solar | 74.9 MW | ~40 km |
| High Springs Solar Power Plant | Solar | 74.9 MW | ~41 km |
See all solar plants in Florida or browse all plants in Florida.