Hardeetown Solar Power Plant

A 74.9 MW solar power plant in Levy, Florida, owned by Duke Energy Florida, LLC, commissioned in 2023.

Facility nameplate · EIA Plant ID 65173Solar
Nameplate capacity
74.9 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2018→2023)
4.5 yrs
Location
Levy, Florida
Generation (2024)
147.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2018, commercial operation 2023 — 4.5 years in the queue. See the Southeast queue or typical durations.

Location

Map of the United States showing the location of Hardeetown Solar Power Plant

Levy, Florida · 29.4856, -82.8435

Reported annual generation

YearGWh
2023123.5
2024147.5

Nearby power plants

PlantFuelCapacityDistance
TrentonStorage11 MW~15 km
Trenton Solar Power PlantSolar74.9 MW~17 km
Gilchrist County SolarSolar74.5 MW~22 km
Bell Ridge SolarSolar74.5 MW~29 km
County Line Renewable Energy CenterSolar74.9 MW~40 km
High Springs Solar Power PlantSolar74.9 MW~41 km