Hardeetown Solar Power Plant

A 74.9 MW solar power plant in Levy, Florida, owned by Duke Energy Florida, LLC, commissioned in 2023.

Facility nameplate · EIA Plant ID 65173Solar
Nameplate capacity
74.9 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (20182023)
4.5 yrs
Owner
Duke Energy Florida, LLC
Location
Levy, Florida
Generation (2024)
147.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2018, commercial operation 2023 4.5 years in the queue. See the Southeast queue or typical durations.

Reported annual generation

YearGWh
2023123.5
2024147.5

Nearby power plants

PlantFuelCapacityDistance
TrentonStorage11 MW~15 km
Trenton Solar Power PlantSolar74.9 MW~17 km
Gilchrist County SolarSolar74.5 MW~22 km
Bell Ridge SolarSolar74.5 MW~29 km
County Line Renewable Energy CenterSolar74.9 MW~40 km
High Springs Solar Power PlantSolar74.9 MW~41 km

See all solar plants in Florida or browse all plants in Florida.