Caden Energix Axton LLC
A 66 MW solar power plant in Henry, Virginia, owned by Caden Energix Axton LLC, commissioned in 2023.
Facility nameplate · EIA Plant ID 66635Solar
Nameplate capacity
66 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2018→2024)
5.5 yrs
Owner
Caden Energix Axton LLC
Location
Henry, Virginia
Coordinates
Generation (2024)
120.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2018, commercial operation 2024 — 5.5 years in the queue. See the PJM queue or typical durations.
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Energix Leatherwood, LLC | Solar | 20 MW | ~5 km |
| Martinsville LFG Generator | Natural Gas | 1.1 MW | ~10 km |
| Martinsville | Hydroelectric | 1.3 MW | ~11 km |
| Edison Farm | Solar | 2 MW | ~17 km |
| Dan River | Natural Gas | 697.9 MW | ~20 km |
| Green Acres (VA) | Solar | 5 MW | ~21 km |
See all solar plants in Virginia or browse all plants in Virginia.