Caden Energix Axton LLC

A 66 MW solar power plant in Henry, Virginia, owned by Caden Energix Axton LLC, commissioned in 2023.

Facility nameplate · EIA Plant ID 66635Solar
Nameplate capacity
66 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (20182024)
5.5 yrs
Owner
Caden Energix Axton LLC
Location
Henry, Virginia
Coordinates
Generation (2024)
120.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2018, commercial operation 2024 5.5 years in the queue. See the PJM queue or typical durations.

Nearby power plants

PlantFuelCapacityDistance
Energix Leatherwood, LLCSolar20 MW~5 km
Martinsville LFG GeneratorNatural Gas1.1 MW~10 km
MartinsvilleHydroelectric1.3 MW~11 km
Edison FarmSolar2 MW~17 km
Dan RiverNatural Gas697.9 MW~20 km
Green Acres (VA)Solar5 MW~21 km