A 200 MW solar power plant in Decatur, Georgia, owned by Washington County Solar, LLC, commissioned in 2024.
Facility nameplate · EIA Plant ID 67047Solar
Nameplate capacity
200 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2018→2024)
6.2 yrs
Owner
Washington County Solar, LLC
Location
Decatur, Georgia
Coordinates
Generation (2024)
161.8 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2018, commercial operation 2024 — 6.2 years in the queue. See the Southeast queue or typical durations.
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| BE Solar LLC | Solar | 3 MW | ~12 km |
| Walton Bainbridge Power Facility | Oil | 80 MW | ~12 km |
| Decatur County Solar Project | Solar | 20 MW | ~21 km |
| Bainbridge Solar | Solar | 1 MW | ~21 km |
| Cairo Solar Farm, LLC | Solar | 2 MW | ~22 km |
| Decatur Parkway Solar Project, LLC | Solar | 80 MW | ~24 km |