Grossmont College
A 2.6 MW solar power plant in San Diego, California, owned by Forefront Power, LLC, commissioned in 2023.
Facility nameplate · EIA Plant ID 67509Solar
Nameplate capacity
2.6 MW
Primary fuel
Solar
Commissioned
2023
Owner
Forefront Power, LLC
Location
San Diego, California
Coordinates
Generation (2024)
4.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 0 | |
| 2024 | 4.4 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Grossmont HS Solar Project | Solar | 1.4 MW | ~1 km |
| Cuyamaca Peak Energy Plant | Natural Gas | 48.7 MW | ~4 km |
| El Cajon Energy Center | Natural Gas | 60.5 MW | ~4 km |
| Grossmont Hospital | Natural Gas | 4.5 MW | ~4 km |
| El Cajon Energy Storage | Storage | 7.5 MW | ~4 km |
| Sycamore Energy LLC | Waste | 5.4 MW | ~5 km |