Grossmont HS Solar Project
A 1.4 MW solar power plant in San Diego, California, owned by MN8 Energy LLC, commissioned in 2018.
Facility nameplate · EIA Plant ID 62987Solar
Nameplate capacity
1.4 MW
Primary fuel
Solar
Commissioned
2018
Owner
Location
San Diego, California
Coordinates
Generation (2024)
1.8 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
Location
San Diego, California · 32.8165, -116.9996
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2019 | 1.7 | |
| 2020 | 2.3 | |
| 2021 | 2.2 | |
| 2022 | 2.3 | |
| 2023 | 2.1 | |
| 2024 | 1.8 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Grossmont College | Solar | 2.6 MW | ~1 km |
| Cuyamaca Peak Energy Plant | Natural Gas | 48.7 MW | ~3 km |
| El Cajon Energy Center | Natural Gas | 60.5 MW | ~3 km |
| Grossmont Hospital | Natural Gas | 4.5 MW | ~4 km |
| El Cajon Energy Storage | Storage | 7.5 MW | ~5 km |
| Sycamore Energy LLC | Waste | 5.4 MW | ~5 km |
See all solar plants in California or browse all plants in California.