El Cajon Energy Center

A 60.5 MW natural gas power plant in San Diego, California, owned by Wellhead Services, Inc, commissioned in 2010.

Facility nameplate · EIA Plant ID 57001Natural Gas
Nameplate capacity
60.5 MW
Primary fuel
Natural Gas
Commissioned
2010
Time in queue (20092010)
1.3 yrs
Owner
Wellhead Services, Inc
Location
San Diego, California
Generation (2024)
9 GWh
Status
Operating
Technology
Natural Gas Fired Combustion Turbine
Units
1

This facility was matched to a CAISO interconnection request (LBNL Queued Up): queued 2009, commercial operation 2010 1.3 years in the queue. See the CAISO queue or typical durations.

Reported annual generation

YearGWh
201515.7
201610.3
201713.4
201816.7
20198.8
20206.4
20216.7
202213.6
20237.6
20249

Nearby power plants

PlantFuelCapacityDistance
Cuyamaca Peak Energy PlantNatural Gas48.7 MW~0 km
Grossmont HS Solar ProjectSolar1.4 MW~3 km
Grossmont HospitalNatural Gas4.5 MW~4 km
Grossmont CollegeSolar2.6 MW~4 km
Grossmont-Cuyamaca-Cuyamaca Col. Solar &Solar2.4 MW~6 km
El Cajon Energy StorageStorage7.5 MW~8 km