Grossmont-Cuyamaca-Cuyamaca Col. Solar &
A 2.4 MW solar power plant in San Diego, California, owned by Forefront Power, LLC, commissioned in 2024.
Facility nameplate · EIA Plant ID 66023Solar
Nameplate capacity
2.4 MW
Primary fuel
Solar
Commissioned
2024
Owner
Location
San Diego, California
Coordinates
Generation (2024)
2.8 GWh
Other fuels
Storage
Status
Operating
Technology
Solar Photovoltaic
Units
2
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| El Cajon Energy Center | Natural Gas | 60.5 MW | ~6 km |
| Cuyamaca Peak Energy Plant | Natural Gas | 48.7 MW | ~6 km |
| Grossmont Hospital | Natural Gas | 4.5 MW | ~7 km |
| Vanadium Redox Flow Battery Plant | Storage | 2 MW | ~9 km |
| PFMG Solar Grossmont Helix LLC | Solar | 1.2 MW | ~9 km |
| Grossmont HS Solar Project | Solar | 1.4 MW | ~10 km |
See all solar plants in California or browse all plants in California.