Keystone Solar

A 5 MW solar power plant in Lancaster, Pennsylvania, owned by Altus Power America Management, LLC, commissioned in 2012.

Facility nameplate · EIA Plant ID 58091Solar
Nameplate capacity
5 MW
Primary fuel
Solar
Commissioned
2012
Time in queue (2009→2012)
2.8 yrs
Location
Lancaster, Pennsylvania
Generation (2024)
7.4 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

This facility was matched to a PJM Interconnection interconnection request (LBNL Queued Up): queued 2009, commercial operation 2012 — 2.8 years in the queue. See the PJM queue or typical durations.

Location

Map of the United States showing the location of Keystone Solar

Lancaster, Pennsylvania · 39.8611, -76.2211

Reported annual generation

YearGWh
20158.4
20168.3
20177.8
20187.1
20197.9
20207.3
20217.5
20227.8
20237.3
20247.4

Nearby power plants

PlantFuelCapacityDistance
Muddy RunHydroelectric1.07 GW~9 km
HoltwoodHydroelectric247.3 MW~10 km
Peach BottomNuclear2.88 GW~12 km
York Energy CenterNatural Gas1.45 GW~16 km
Safe HarborHydroelectric417.5 MW~16 km
Wildcat Point Generation FacilityNatural Gas1.11 GW~17 km

See all solar plants in Pennsylvania or browse all plants in Pennsylvania.