Bell Ridge Solar
A 74.5 MW solar power plant in Gilchrist, Florida, owned by Bell Ridge Solar, LLC, commissioned in 2023.
Facility nameplate · EIA Plant ID 65519Solar
Nameplate capacity
74.5 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2016→2023)
7.1 yrs
Owner
Bell Ridge Solar, LLC
Location
Gilchrist, Florida
Coordinates
Generation (2024)
189.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2016, commercial operation 2023 — 7.1 years in the queue. See the Southeast queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 60.4 | |
| 2024 | 189.5 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| County Line Renewable Energy Center | Solar | 74.9 MW | ~11 km |
| Gilchrist County Solar | Solar | 74.5 MW | ~12 km |
| High Springs Solar Power Plant | Solar | 74.9 MW | ~12 km |
| Trenton | Storage | 11 MW | ~15 km |
| Trenton Solar Power Plant | Solar | 74.9 MW | ~16 km |
| Santa Fe Solar Power Plant | Solar | 74.9 MW | ~18 km |