High Springs Solar Power Plant
A 74.9 MW solar power plant in Alachua, Florida, owned by Duke Energy Florida, LLC, commissioned in 2023.
Facility nameplate · EIA Plant ID 65172Solar
Nameplate capacity
74.9 MW
Primary fuel
Solar
Commissioned
2023
Time in queue (2017→2023)
5.8 yrs
Owner
Duke Energy Florida, LLC
Location
Alachua, Florida
Coordinates
Generation (2024)
148.1 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2017, commercial operation 2023 — 5.8 years in the queue. See the Southeast queue or typical durations.
Reported annual generation
| Year | GWh | |
|---|---|---|
| 2023 | 102.2 | |
| 2024 | 148.1 |
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| County Line Renewable Energy Center | Solar | 74.9 MW | ~3 km |
| Columbia Solar Power Plant | Solar | 74.9 MW | ~10 km |
| Santa Fe Solar Power Plant | Solar | 74.9 MW | ~12 km |
| Columbia County Solar | Solar | 74.5 MW | ~12 km |
| Bell Ridge Solar | Solar | 74.5 MW | ~12 km |
| Gilchrist County Solar | Solar | 74.5 MW | ~21 km |
See all solar plants in Florida or browse all plants in Florida.