Columbia County Solar
A 74.5 MW solar power plant in Columbia, Florida, owned by FRP Columbia County Solar, LLC, commissioned in 2024.
Facility nameplate · EIA Plant ID 67206Solar
Nameplate capacity
74.5 MW
Primary fuel
Solar
Commissioned
2024
Time in queue (2016→2024)
7.3 yrs
Owner
FRP Columbia County Solar, LLC
Location
Columbia, Florida
Coordinates
Generation (2024)
38.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1
This facility was matched to a Non-ISO Southeast interconnection request (LBNL Queued Up): queued 2016, commercial operation 2024 — 7.3 years in the queue. See the Southeast queue or typical durations.
Nearby power plants
| Plant | Fuel | Capacity | Distance |
|---|---|---|---|
| Santa Fe Solar Power Plant | Solar | 74.9 MW | ~0 km |
| Columbia Solar Power Plant | Solar | 74.9 MW | ~4 km |
| County Line Renewable Energy Center | Solar | 74.9 MW | ~10 km |
| High Springs Solar Power Plant | Solar | 74.9 MW | ~12 km |
| Hildreth Solar Power Plant | Solar | 74.9 MW | ~13 km |
| Bell Ridge Solar | Solar | 74.5 MW | ~18 km |
See all solar plants in Florida or browse all plants in Florida.