Hildreth Solar Power Plant

A 74.9 MW solar power plant in Suwannee, Florida, owned by Duke Energy Florida, LLC, commissioned in 2023.

Facility nameplate · EIA Plant ID 65170Solar
Nameplate capacity
74.9 MW
Primary fuel
Solar
Commissioned
2023
Owner
Duke Energy Florida, LLC
Location
Suwannee, Florida
Generation (2024)
168.5 GWh
Status
Operating
Technology
Solar Photovoltaic
Units
1

Reported annual generation

YearGWh
2023138.7
2024168.5

Nearby power plants

PlantFuelCapacityDistance
Columbia County SolarSolar74.5 MW~13 km
Santa Fe Solar Power PlantSolar74.9 MW~13 km
Columbia Solar Power PlantSolar74.9 MW~15 km
County Line Renewable Energy CenterSolar74.9 MW~22 km
High Springs Solar Power PlantSolar74.9 MW~25 km
Bell Ridge SolarSolar74.5 MW~29 km

See all solar plants in Florida or browse all plants in Florida.